| MOQ: | 1 set |
| Price: | 58000 - 70000 USD per set |
| Standard Packaging: | After being wrapped with stretch film , it is shipped unpacked in the container . |
| Delivery Period: | 15 - 25 working days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 20 sets per month |
| Component | Unit | Quantity |
|---|---|---|
| Drying Device | Set | 1 |
| SJ - 55/30 Single-Screw Extruder | Set | 1 |
| Head Die (with Metering Pump) | Set | 1 |
| Stainless Steel Cooling Water Tank | Set | 1 |
| First Tractor (Five-Roller) | Set | 1 |
| Heat Stretching Box | Set | 1 |
| Second Tractor (Seven-Roller) | Set | 1 |
| Third Tractor (Seven-Roller) | Set | 1 |
| Oil-Coating Machine | Unit | 1 |
| Coiling Machine | Unit | 1 |
| Temperature-Control Instrument Control System | Set | 1 |
| MOQ: | 1 set |
| Price: | 58000 - 70000 USD per set |
| Standard Packaging: | After being wrapped with stretch film , it is shipped unpacked in the container . |
| Delivery Period: | 15 - 25 working days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 20 sets per month |
| Component | Unit | Quantity |
|---|---|---|
| Drying Device | Set | 1 |
| SJ - 55/30 Single-Screw Extruder | Set | 1 |
| Head Die (with Metering Pump) | Set | 1 |
| Stainless Steel Cooling Water Tank | Set | 1 |
| First Tractor (Five-Roller) | Set | 1 |
| Heat Stretching Box | Set | 1 |
| Second Tractor (Seven-Roller) | Set | 1 |
| Third Tractor (Seven-Roller) | Set | 1 |
| Oil-Coating Machine | Unit | 1 |
| Coiling Machine | Unit | 1 |
| Temperature-Control Instrument Control System | Set | 1 |