MOQ: | 1 set |
Price: | 58000 - 70000 USD per set |
Standard Packaging: | After being wrapped with stretch film , it is shipped unpacked in the container . |
Delivery Period: | 15 - 25 working days |
Payment Method: | L/C,T/T |
Supply Capacity: | 20 sets per month |
Component | Unit | Quantity |
---|---|---|
Drying Device | Set | 1 |
SJ - 55/30 Single-Screw Extruder | Set | 1 |
Head Die (with Metering Pump) | Set | 1 |
Stainless Steel Cooling Water Tank | Set | 1 |
First Tractor (Five-Roller) | Set | 1 |
Heat Stretching Box | Set | 1 |
Second Tractor (Seven-Roller) | Set | 1 |
Third Tractor (Seven-Roller) | Set | 1 |
Oil-Coating Machine | Unit | 1 |
Coiling Machine | Unit | 1 |
Temperature-Control Instrument Control System | Set | 1 |
MOQ: | 1 set |
Price: | 58000 - 70000 USD per set |
Standard Packaging: | After being wrapped with stretch film , it is shipped unpacked in the container . |
Delivery Period: | 15 - 25 working days |
Payment Method: | L/C,T/T |
Supply Capacity: | 20 sets per month |
Component | Unit | Quantity |
---|---|---|
Drying Device | Set | 1 |
SJ - 55/30 Single-Screw Extruder | Set | 1 |
Head Die (with Metering Pump) | Set | 1 |
Stainless Steel Cooling Water Tank | Set | 1 |
First Tractor (Five-Roller) | Set | 1 |
Heat Stretching Box | Set | 1 |
Second Tractor (Seven-Roller) | Set | 1 |
Third Tractor (Seven-Roller) | Set | 1 |
Oil-Coating Machine | Unit | 1 |
Coiling Machine | Unit | 1 |
Temperature-Control Instrument Control System | Set | 1 |