| MOQ: | 1 set |
| Price: | 220000 - 300000 USD per set |
| Standard Packaging: | After being wrapped with stretch film , it is shipped unpacked in the container . |
| Delivery Period: | 15 - 25 working days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 20 sets per month |
| Warranty | 12 months |
|---|---|
| Single Screw | SJ120 Single Screw |
| Dimensions | 50 × 2 × 2.8 m |
| Weight | Approximately 10 tons |
Our HDPE large-diameter pipe equipment can produce two-layer, three-layer, multi-layer composite pipes or reinforced composite pipes by replacing the pipe mold, increasing the number of single-screw extruders, and updating the production line.
| Pipe Specifications (mm) | Extruder | Output (kg/h) | Available Sizes |
|---|---|---|---|
| 160-315 | 90×33 | 350-450 | 160,180,200,225,250,280,315 |
| 315-630 | 120×33 | 850-1000 | 315,355,400,450,500,560,630 |
| 710-1200 | 90×33 120×33 | 1200-1500 | 710,800,900,1000,1200 |
|
|
| MOQ: | 1 set |
| Price: | 220000 - 300000 USD per set |
| Standard Packaging: | After being wrapped with stretch film , it is shipped unpacked in the container . |
| Delivery Period: | 15 - 25 working days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 20 sets per month |
| Warranty | 12 months |
|---|---|
| Single Screw | SJ120 Single Screw |
| Dimensions | 50 × 2 × 2.8 m |
| Weight | Approximately 10 tons |
Our HDPE large-diameter pipe equipment can produce two-layer, three-layer, multi-layer composite pipes or reinforced composite pipes by replacing the pipe mold, increasing the number of single-screw extruders, and updating the production line.
| Pipe Specifications (mm) | Extruder | Output (kg/h) | Available Sizes |
|---|---|---|---|
| 160-315 | 90×33 | 350-450 | 160,180,200,225,250,280,315 |
| 315-630 | 120×33 | 850-1000 | 315,355,400,450,500,560,630 |
| 710-1200 | 90×33 120×33 | 1200-1500 | 710,800,900,1000,1200 |